The Dormitories

Learn more about the entire SHUMLA School campus.
  The Dormitory building at the SHUMLA School campus has been completed. This structure—located just west of the Pavilion—is made up of two 16 x 32-ft rooms with a 4-ft porch along one side, and will be used to house students during overnight programs. It will also be used for classes during inclement weather. Funded by a grant received from the Albert and Ethel Herzstein Charitable Foundation, this building will be named in honor of Bill and Nina Merle Rios, longtime residents and community leaders of Del Rio, Texas. Construction was carried out by Dominion Engineering of Del Rio, owned by Tom Springfield and Gurvis Vernor.
Click on pictures to enlarge. Pictures are arranged from most recent to oldest.
 
Dormitory takes its place.
The dormitory is completed and takes its place to the west of the Pavilion.
06/20/07
Interior view east room.
The east room is completed.
06/20/07
West room interior.
Interior view of the west room.
06/20/07
Shutters installed.
The shutters and doors have been installed.
05/28/07
Interior finish work continues.
The interior finish work is in progress.
05/28/07
Really matching the other campus buildings.
The Dormitory building is really starting to match the other campus structures.
05/14/07
Framework for porch roof.
The framework for the porch has been added.
05/14/07
Exterior finishing work has begun.
Exterior finishing work is underway.
05/04/07
It's looking like a building.
It's looking like a building!
05/04/07
The roof is on and inside finishing has started.
The roof is on and inside finishing work has started.
05/04/07
Stucco is applied to the exterior.
Stucco is applied to the exterior of the walls.
04/26/07
The roof supports are installed.
The roof supports are installed.
04/26/07
Exterior walls are up
The exterior walls are up.
03/27/07
All the window and door frames are in place.
All the window and door frames are in place.
03/27/07
Exterior walls being finished off.
Finishing off the exterior walls.
03/27/07
Framing windows and doors.
Windows will provide a beautiful view from the building.
03/19/07
Walls are going up.
Window frames are installed as the walls are constructed.
03/16/07
Walls and windows.
The walls are going up.
03/16/07
The building materials have been delivered.
The building materials have been delivered.
03/16/07
Dormitory slab.
The dormitory slab has been poured, just west of the Pavilion.
03/03/07
Slab is curing.
The slab is covered with water so it will cure slowly.
03/03/07
Location of new dormitories.
This area will soon see activity as construction on the dormitories begins.
02/21/07
View from location of future dormitories.
This is approximately the view from the soon-to-be-built dormitories.
02/21/07
Discussion construction plans.
Tom Springfield (Dominion Engineering) and Walker Boyd (right) discuss construction plans.
02/21/07